ongoing Construction
Painting
This foreclosure was originally built in 2004, never lived in, and never finished. We purchased the property in July 2019. We plan to paint the exterior in spring 2023. We chose blue with brown trim. We are adding batten strips and removing the triangle windows in the gables.

Bedroom 1
Still needs trim and the closet fixtures.

landscaping
According to Satellite images I could find of the property it has been bulldozed 3 times in 15 years. Getting grass to hold without topsoil is a challenge. We are making flower beds around the house that we will likely trample when we paint in 2023.

kitchenette
The guest level has 2 bedrooms and 1 bathroom. There is a sitting area and a place to build the kitchenette. The kitchenette needs sound proofing in the ceiling, plumbing and electrical, and furnishings.